Development of town planning documentation: Construction plot plans for individual areas. Utilities design: Heating, ventilation and air conditioning; utilities supply systems (water, heating, sewerage, electric heating).
Development of town planning documentation:
Construction plot plans for individual areas.
Utilities design: Heating, ventilation and air conditioning; utilities supply systems (water, heating, sewerage, electric heating).
Architectural Engineering:
Electric grid facilities of industrial type, public facilities, highways of Categories II (regional), III, IV,V, interiors;
Structural Design:
Sub-bases and foundations of buildings and structures; reinforced concrete, stone, reinforced masonry, steel and aluminum structures of both tailored and typical design, assemblies and components (including those constructed in severe geotechnical and hydrogeological environment, areas with estimated seismic rates 7, 8, 9 and 10).