Power Supply Engineering

Development of long-term strategies and concepts of the electric power complex in the Republic of Kazakhstan, including specific major and vertically integrated companies;

Development of long-term strategies and concepts of the electric power complex in the Republic of Kazakhstan, including specific major and vertically integrated companies;

Substantiation for construction of new generating sources based on the balance of primary fuel and power resources and perspective diversification of the generating assets;
Technical and economic studies of the development of the energy industry of Kazakhstan;
Marketing research of the electric energy market;
Scheme development for electric grids 35 kV and above for united power grid regions of Kazakhstan, industrial hubs, cities and towns and regions;
Feasibility studies and power distribution schemes for power plants (condensing power plants, combined heat and power stations, nuclear power plants, gas-turbine thermal power plants, hydro-electric power stations, small hydro-electric power stations and wind energy systems);
Development of external power supply schemes (industrial enterprises, minefields, electrified railway sections, pipeline systems etc.);
Cost-effective analysis for investment to electric energy projects, financial-economic analysis;

Power supply section as a part of general urban area development plans, detailed design plans.

58 Abylai Khan ave., Almaty
Phone: 7 727 355 18 88